Bronze coated glazing wrapping a low-rise campus beneath a monumental stone pergola at the Desalination Oasis

For the Specified Coating

Coated glass, processed under Guardian certification

The coating is the consultant’s choice; the fabrication is ours. Golden Glass processes SunGuard SN, DS and HP, plus ClimaGuard coated glass, at 4, 6 and 8 mm, in Riyadh under Guardian certification, to the maker’s published guidelines. Quotation within 48 hours.

  • SunGuard SN · DS · HP · ClimaGuard
  • 4 / 6 / 8 mm
  • Certificate HA220726

Certified Scope

What the certificate covers, and where the numbers live

Two authorities stand behind a coated-glass package: Guardian owns the coating and its performance data; Golden Glass owns the fabrication. This page states each claim at its honest size.

Coating familiesSunGuard SN · DS · HP · ClimaGuard
Thicknesses4, 6 and 8 mm
Certified processesMechanical processing · heat treatment · insulated-glass assembly
CertificateHA220726 · What each certification covers →

The certified scope

We process coated glass as a Guardian-certified fabricator, certificate HA220726. The certified scope is SunGuard SN, DS and HP, plus ClimaGuard coatings, at 4, 6 and 8 mm: mechanical processing, heat treatment, and insulated-glass assembly.

We procure the coated glass ourselves and fabricate it here; a quotation from this page prices supply and fabrication together. Certification is renewed annually; what it attests is processing to Guardian’s guidelines. A spec outside that scope, a different thickness or another maker’s coating, is not a wall: name it in the quote request and the answer comes in writing. What each certification covers →

Where the performance numbers live

Performance values for a low-E or solar-control coating, such as U-value, solar factor and light transmission, are the maker’s numbers: Guardian publishes them and revises them without notice. So we do not republish them, on this page or in a datasheet of our own; a copied table goes quietly stale in front of the one reader who acts on it.

For current figures on any SunGuard or ClimaGuard product, use Guardian’s own selector, and we will quote the build-up you choose from it. Guardian Glass Visualizer →

Run in Production

Coatings we have run, on named buildings

Scope and track record are two different sizes of claim. The certificate names the families we are certified to process; the buildings below name the coatings we have run at facade scale, with the areas as delivered. The two lists are not the same list: HD Bronze runs outside the certificate’s four families, and not every certified family has a named building here. Oasis and Qiddiya shipped as insulated units. Insulated glass units →

Glass-and-stone office blocks of Axis Commercial Center rising behind branded site hoarding

Axis Commercial Center

Riyadh · 8,000 m² · SunGuard SN 40

Marriott hotel facade nearing completion — dense vertical stone fins with dark structural-glazing bands

Marriott Hotel

Riyadh · 3,800 m² · SN 50 Grey

Low-rise campus with bronze glazing under a monumental stone pergola at the Rabigh Desalination Oasis

Desalination Oasis

Rabigh · 5,500 m² · HD Bronze + argon · outside the certified families

The way an order reads: Qiddiya, Riyadh Province · 1,800 m² of 6 mm SN 40 + 16 + 6 mm clear · order delivered. Name the coating and the build-up in that form, and the quotation comes back priced against it.

Inside the Factory

How coated glass moves through the line

A coating decides how the glass is handled at every station: which face may touch a roller, what the edge must shed before sealing, how the furnace is set. The lines it moves through: CNC cutting to 6,100 × 3,400 mm, a tempering bed of 6,000 × 2,600 mm. A line dimension is a machine envelope, not a finished-panel guarantee. Four checks follow it through the factory, as the build-up requires.

Coating faceVerified by laser measurement, per order
Edge deletionCoating stripped at the sealed perimeter, so the unit seals to glass
Heat treatmentTempering and heat strengthening to the maker’s published guidelines
Unit assemblyInsulated glass units to EN 1279, with argon fill
Red tempering-furnace line on the factory floor, glass racks and mezzanine offices beyond

Certified · Tested · Documented

ISO

ISO 9001:2015

Quality management system

Guardian

Certified fabricator

certificate HA220726

SGCC

Certified tempering

tempered safety glass

AGC Obeikan

Approved processor

raw-glass partner program

Trusted Across the Kingdom

KAFD
Almarai
NHC
PIF
Qiddiya
Marriott
Golden Glass symbol

Name the coating; we quote the build-up

01Name the coating and the build-up as the spec writes them, 6 mm SN 40 + 16 + 6 mm clear for example, with sizes, quantities, and the delivery location.

02Quotation within 48 hours: the build-up you named, priced line by line, in writing.

03Fabrication with inspection reports at every stage, delivered Kingdom-wide on protective racks.

Name the surface the coating sits on; we confirm it on the drawing before fabrication. Select the closest glass type in the form; IGU is preselected, and if your coating ships on a single lite, choose tempered or laminated and name the coating in the details. Quotation terms, samples, payment, and delivery are answered in the FAQ.

info@goldenglass.com.sa
goldenglass.com.sa
AlFawzan Industrial Zone, Al Kharj Road, Riyadh

Sales office — 8311 Salah Addin Al Ayyubi Rd, Al Malaz, Riyadh
Walid Saeed, Sales & Marketing Director · +966 54 756 5510 · WhatsApp

Tell us about your project

The button opens a pre-filled email in your mail app. We reply within 48 hours — your details go only to our sales team.

We use these details only to answer your request — how we handle them.